Skip to main content
Live · updated daily
Upcoming crypto events calendar

Follow the world of blockchain with our cryptocalendar. Here are all the main events related to crypto. Updates daily.

Upcoming crypto events calendar

Events

Date Event name Location
December 2026
TBA
December
2026, date TBC
Ethereum Economic Zone first production EEZ rollup (Gnosis Chain transition)
  • Mainnet Launch
  • Ethereum
Online
TBA
December
2026, date TBC
GAO investigation into CFTC workforce reduction begins
  • Regulatory Deadline
  • Regulation
Online
TBA
December
2026, date TBC
Avareun AI (AVN) planned exchange listings
  • Listing
  • Cryptocurrency
Online
Q4
2026
date TBC
Midnight Ledger v9 upgrade mainnet release
  • Mainnet Launch
  • Blockchain
Online
TBA
December
2026, date TBC
Cardano Ouroboros Leios mainnet deployment
  • Mainnet Launch
  • Blockchain
Online
TBA
December
2026, date TBC
Ethereum Glamsterdam mainnet upgrade
  • Network Upgrade
  • Ethereum
Online
TBA
December
2026, date TBC
SBI DigiTrust, NICE and DSRV stablecoin QR payment verification testing completion
  • Testnet
  • Stablecoins
Online
TBA
December
2026, date TBC
SBI DigiTrust, NICE and DSRV Japan-Korea stablecoin QR payment pilot
  • Event
  • Stablecoins
Online
TBA
December
2026, date TBC
Standard Chartered Singapore institutional crypto custody launch
  • Product Release
  • Cryptocurrency
Online
January 2027
01
January
2027, Fri
Expanded Central Bank crypto supervisory data and anti-fraud retention rules take effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
French stablecoin swap tax takes effect
  • Regulatory Deadline
  • Stablecoins
Online
01
January
2027, Fri
South Korea 22% crypto gains tax takes effect
  • Regulatory Deadline
  • Regulation
Online
08
January
2027, Fri
ESMA deadline for exiting unauthorised stablecoins in the EU
  • Regulatory Deadline
  • Regulation
Online
08
January
2027, Fri
ESMA MiCA noncompliant stablecoin remediation deadline
  • Regulatory Deadline
  • Stablecoins
Online
11
January
2027, Mon
IO token unlock (8.55M IO) - November 2026
  • Token unlock
  • AI
Online
15 - 31
January
2027, Fri - Sun
StandX wind-down deadlines: position closure and withdrawals
  • Event
  • DeFi
Online
18
January
2027, Mon
GENIUS Act federal stablecoin framework takes effect
  • Regulatory Deadline
  • Regulation
Online
22
January
2027, Fri
Grass Stage 2 reward claim deadline
  • Airdrop
  • Blockchain
Online
Q1
2027
date TBC
FLOP AI agent network mainnet launch
  • Mainnet Launch
  • AI
Online
Q1
2027
date TBC
The Clearing House tokenized deposit network with Quant availability
  • Product Release
  • Blockchain
Online
Q1
2027
date TBC
FLOP Network mainnet launch
  • Mainnet Launch
  • AI
Online
TBA
January
2027, date TBC
Zakura post-quantum signatures for Zcash transparent pool
  • Product Release
  • Cryptocurrency
Online
Q1
2027
date TBC
Bank consortium USD stablecoin launch (Wells Fargo and 20 other institutions)
  • Product Release
  • Stablecoins
Online
TBA
January
2027, date TBC
Avareun AI platform launch
  • Product Release
  • Blockchain
Online
Q1
2027
date TBC
Veria mainnet launch
  • Mainnet Launch
  • Blockchain
Online
Mainnet Launch Blockchain

Gravity Alpha Mainnet shutdown and withdrawal deadline

01 November 2026, Sunday
Online Location
G · USDC · USDT · WETH · DAI Galxe (Gravity)

Galxe is decommissioning its Gravity Alpha Mainnet layer 2 on 1 November 2026, after which any tokens left on the chain can no longer be transferred. Assets such as G, USDC, USDT, WETH and DAI must be bridged out beforehand, and because of the roughly seven-day challenge period on the standard bridge, the practical deadline is around 25 October.

What is happening

Gravity Alpha Mainnet is the older version of the Gravity network, launched by Galxe in 2024 as a layer 2 on the Arbitrum Nitro stack with chain ID 1625. With Gravity L1 (chain ID 127001) now in full operation, the Alpha chain has served its purpose. Galxe's documentation lists it as "legacy" and advises moving all balances back to Ethereum before 1 November. After that date, anything still on the chain will not be transferable.

The exit route depends on the token. G, DAI and WBTC leave through the official Gravity bridge. USDC, USDT and ETH/WETH were issued via Stargate and can only be withdrawn there; on Stargate, USDC appears as USDC.e. The standard bridge has a challenge period of about seven days, so a withdrawal started on 25 October just fits, while one started on 29 October does not. For G there is also a Fast Withdraw option on the Gravity bridge that takes about ten minutes, after which the tokens can be bridged on to Gravity L1 using a small amount of ETH for fees.

Staked G must be unstaked first, since the staking interface goes away with the chain, and unstaking may carry its own cooldown. Galxe Quests contracts have already moved to Gravity L1, so claims fail if G is still on the old chain. Developers must redeploy dApps and scripts to Gravity L1 and update chain IDs and contract addresses. Some sources mention December 2026 for the technical wind-down, but the withdrawal date they require is still 1 November.

Why it matters

For holders, the issue is not price but access. G traded at around $0.0041 in the latest reporting, with a market capitalisation of just under $30 million, so balances are often small, but tokens left behind after the shutdown cannot be moved. Mistakes are easy to make because different tokens use different exits, and the wait on the standard route brings the real deadline forward by about a week.

For the wider market, the shutdown fits a pattern of smaller layer 2 networks being wound down as they compete for limited usage. For users who still collect Galxe points or rewards, having G on Gravity L1 is required for claims to work. Traders and holders should check which chain each balance sits on and plan the exit route well ahead of the cutoff.

Key details

  • Date: 1 November 2026 (shutdown and withdrawal deadline); practical deadline for the standard bridge around 25 October 2026
  • Project: Galxe (Gravity)
  • Coins: G, USDC, USDT, WETH, DAI
  • Category: Mainnet Launch
  • Status: Confirmed
  • Source: https://cryptoticker.io/en/galxe-gravity-alpha-withdraw-funds/