Skip to main content
Live · updated daily
Upcoming crypto events calendar

Follow the world of blockchain with our cryptocalendar. Here are all the main events related to crypto. Updates daily.

Upcoming crypto events calendar

Events

Date Event name Location
October 2026
23
October
2026, Fri
Bitget delists GAIB
  • Delisting
  • trading
Bitget
23
October
2026, Fri
Bitget delists DRIFT
  • Delisting
  • trading
Bitget
23
October
2026, Fri
Bitget delists SWEAT
  • Delisting
  • trading
Bitget
23
October
2026, Fri
Bitget delists PUMPBTC
  • Delisting
  • trading
Bitget
23
October
2026, Fri
Bitget delists RVV
  • Delisting
  • trading
Bitget
23
October
2026, Fri
Bitget delists ICX
  • Delisting
  • trading
Bitget
24
October
2026, Sat
XRPL Commons New York hackathon (XRP Ledger lending)
  • Hackathon
  • Blockchain
USA, New York
24
October
2026, Sat
X Empire (X) token spot listing on OKX
  • Listing
  • Cryptocurrency
Online
24 - 25
October
2026, Sat - Sun
XRPL Week New York: 36-hour hackathon
  • Hackathon
  • Blockchain
USA, New York
25
October
2026, Sun
Brazil presidential runoff election
  • Regulatory Deadline
  • Regulation
Online
25
October
2026, Sun
Plasma XPL monthly token unlock (first joint tranche)
  • Token unlock
  • Cryptocurrency
Online
25 - 27
October
2026, Sun - Tue
Korea Fintech Week 2026
  • Conference
  • Fintech
Korea South, Seoul
25
October
2026, Sun
Pharos airdrop claim portal closes
  • Airdrop
  • Blockchain
Online
26
October
2026, Mon
Aster trading rewards end and large reward distribution
  • Token unlock
  • DeFi
Online
26
October
2026, Mon
Blast Ethereum Layer 2 shutdown and withdrawal deadline
  • Event
  • Ethereum
Online
26 - 31
October
2026, Mon - Sat
Samsung Wallet USDC cross-border transfers on Solana launch
  • Product Release
  • Stablecoins
Online
26 - 31
October
2026, Mon - Sat
Samsung Wallet stablecoin (USDC) functionality launch in the US
  • Product Release
  • Stablecoins
Online
26 - 31
October
2026, Mon - Sat
USDC launch on Samsung Wallet in the US
  • Partnership
  • Stablecoins
Online
26
October
2026, Mon
Ethereum Glamsterdam upgrade on Hoodi testnet
  • Testnet
  • Ethereum
Online
26
October
2026, Mon
Upbit delists BLAST
  • Delisting
  • trading
Upbit
26 - 31
October
2026, Mon - Sat
USDC launch in Samsung Wallet (US)
  • Product Release
  • Stablecoins
Online
26 - 31
October
2026, Mon - Sat
Samsung Wallet USDC stablecoin launch in the U.S.
  • Product Release
  • Stablecoins
Online
26
October
2026, Mon
Avareun AI (AVN) token sale ends
  • Token Sale
  • Cryptocurrency
Online
26 - 31
October
2026, Mon - Sat
Samsung Wallet and Samsung Pay USDC transfers launch in the US
  • Product Release
  • Stablecoins
Online
26 - 31
October
2026, Mon - Sat
Samsung Wallet USDC stablecoin support launch for US Galaxy users
  • Product Release
  • Stablecoins
Online
Mainnet Launch Blockchain

Gravity Alpha Mainnet shutdown and withdrawal deadline

01 November 2026, Sunday
Online Location
G · USDC · USDT · WETH · DAI Galxe (Gravity)

Galxe is decommissioning its Gravity Alpha Mainnet layer 2 on 1 November 2026, after which any tokens left on the chain can no longer be transferred. Assets such as G, USDC, USDT, WETH and DAI must be bridged out beforehand, and because of the roughly seven-day challenge period on the standard bridge, the practical deadline is around 25 October.

What is happening

Gravity Alpha Mainnet is the older version of the Gravity network, launched by Galxe in 2024 as a layer 2 on the Arbitrum Nitro stack with chain ID 1625. With Gravity L1 (chain ID 127001) now in full operation, the Alpha chain has served its purpose. Galxe's documentation lists it as "legacy" and advises moving all balances back to Ethereum before 1 November. After that date, anything still on the chain will not be transferable.

The exit route depends on the token. G, DAI and WBTC leave through the official Gravity bridge. USDC, USDT and ETH/WETH were issued via Stargate and can only be withdrawn there; on Stargate, USDC appears as USDC.e. The standard bridge has a challenge period of about seven days, so a withdrawal started on 25 October just fits, while one started on 29 October does not. For G there is also a Fast Withdraw option on the Gravity bridge that takes about ten minutes, after which the tokens can be bridged on to Gravity L1 using a small amount of ETH for fees.

Staked G must be unstaked first, since the staking interface goes away with the chain, and unstaking may carry its own cooldown. Galxe Quests contracts have already moved to Gravity L1, so claims fail if G is still on the old chain. Developers must redeploy dApps and scripts to Gravity L1 and update chain IDs and contract addresses. Some sources mention December 2026 for the technical wind-down, but the withdrawal date they require is still 1 November.

Why it matters

For holders, the issue is not price but access. G traded at around $0.0041 in the latest reporting, with a market capitalisation of just under $30 million, so balances are often small, but tokens left behind after the shutdown cannot be moved. Mistakes are easy to make because different tokens use different exits, and the wait on the standard route brings the real deadline forward by about a week.

For the wider market, the shutdown fits a pattern of smaller layer 2 networks being wound down as they compete for limited usage. For users who still collect Galxe points or rewards, having G on Gravity L1 is required for claims to work. Traders and holders should check which chain each balance sits on and plan the exit route well ahead of the cutoff.

Key details

  • Date: 1 November 2026 (shutdown and withdrawal deadline); practical deadline for the standard bridge around 25 October 2026
  • Project: Galxe (Gravity)
  • Coins: G, USDC, USDT, WETH, DAI
  • Category: Mainnet Launch
  • Status: Confirmed
  • Source: https://cryptoticker.io/en/galxe-gravity-alpha-withdraw-funds/