Skip to main content
Live · updated daily
Upcoming crypto events calendar

Follow the world of blockchain with our cryptocalendar. Here are all the main events related to crypto. Updates daily.

Upcoming crypto events calendar

Events

Date Event name Location
January 2027
01
January
2027, Fri
South Korea 22% cryptocurrency income tax takes effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
French stablecoin swap tax takes effect
  • Regulatory Deadline
  • Stablecoins
Online
01
January
2027, Fri
South Korea crypto gains tax takes effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
South Korea 22% crypto gains tax takes effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
South Korea 22% crypto gains tax start date
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
South Korea 22% crypto gains tax takes effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
ZetaChain investor and contributor token full unlock
  • Token unlock
  • Cryptocurrency
Online
01
January
2027, Fri
Expanded Central Bank crypto supervisory data and anti-fraud retention rules take effect
  • Regulatory Deadline
  • Regulation
Online
01
January
2027, Fri
North Carolina HB 920 crypto ATM (BTM) regulations take effect
  • Regulatory Deadline
  • Regulation
Online
03
January
2027, Sun
119th Congress ends - CLARITY Act expires if not passed
  • Regulatory Deadline
  • Regulation
Online
03
January
2027, Sun
New Congress convenes and elects House Speaker
  • Regulatory Deadline
  • Regulation
USA, Washington
03
January
2027, Sun
CLARITY Act expiry deadline
  • Regulatory Deadline
  • Regulation
Online
06
January
2027, Wed
Hyperliquid team HYPE token unlock (first distribution)
  • Token unlock
  • DeFi
Online
08
January
2027, Fri
ESMA MiCA noncompliant stablecoin remediation deadline
  • Regulatory Deadline
  • Stablecoins
Online
08
January
2027, Fri
ESMA deadline for exiting unauthorised stablecoins in the EU
  • Regulatory Deadline
  • Regulation
Online
11
January
2027, Mon
IO token unlock (8.55M IO) - November 2026
  • Token unlock
  • AI
Online
12
January
2027, Tue
Acala LDOT validator unlock deadline
  • Staking
  • DeFi
Online
15 - 31
January
2027, Fri - Sun
StandX wind-down deadlines: position closure and withdrawals
  • Event
  • DeFi
Online
18 - 22
January
2027, Mon - Fri
Web3 Incubation Program investor Demo Day
  • Event
  • Startup
Online
18
January
2027, Mon
GENIUS Act expected general effective date
  • Regulatory Deadline
  • Stablecoins
Online
18
January
2027, Mon
OCC GENIUS Act stablecoin final rule takes effect
  • Regulatory Deadline
  • Stablecoins
Online
18
January
2027, Mon
GENIUS Act stablecoin interest/yield prohibition takes effect
  • Regulatory Deadline
  • Stablecoins
Online
18
January
2027, Mon
GENIUS Act stablecoin law takes effect
  • Regulatory Deadline
  • Regulation
Online
18
January
2027, Mon
GENIUS Act federal stablecoin framework takes effect
  • Regulatory Deadline
  • Regulation
Online
18
January
2027, Mon
GENIUS Act becomes effective
  • Regulatory Deadline
  • Stablecoins
Online
This week Network Upgrade Blockchain

Flare go-flare v1.15.1 emergency hard fork

18 November 2026, Wednesday
Online Location
FLR Flare Network

Flare Network is activating the mandatory go-flare v1.15.1 hard fork on 18 November 2026 at 14:00 UTC, bringing the update forward after an attempted exploit of a bug was detected. The upgrade concerns the network behind the FLR token and is aimed at validators and node operators.

What is happening

Flare's monitoring systems detected an attempt to exploit a bug in the node software. The go-flare v1.15.1 release is a hard fork that patches a weakness in upstream code on which Flare's nodes run. The fix had originally been planned for later in the month, but the project moved the date forward after spotting someone trying to use the vulnerability.

Validators and node operators are urged to upgrade to the new version before the activation time. Nodes that do not upgrade risk falling out of step with the network once the fork goes live, which is the usual consequence of a mandatory hard fork. Flare states that user funds and keys are not affected, and ordinary users do not need to take any action.

go-flare is the node software that runs the Flare and Songbird networks. According to the project's GitHub repository, it is a modified version of avalanchego and coreth that incorporates the Flare Time Series Oracle (FTSO) and State Connector, so fixes in the upstream Avalanche codebase can be relevant to Flare's own nodes. Flare has not published further technical detail on the weakness in the sources reviewed, and operators are directed to the official go-flare release notes for upgrade instructions.

Why it matters

Mandatory node upgrades are a regular part of the network's operation; earlier releases such as go-flare v1.12.0 in November 2025 also required all node operators to upgrade before activation dates. What sets v1.15.1 apart is that it was accelerated in response to a detected exploit attempt rather than following a pre-announced schedule, which leaves operators a short window to prepare.

Validators take part in consensus voting and are selected as block proposers, weighted by their total stake, so keeping them on the same software version matters when a protocol-level fix is deployed. For FLR holders, the main points are that funds and keys are reported as unaffected and that no action is required from them. Those who delegate or run infrastructure may want to confirm that their validator or provider has upgraded in time.

Key details

  • Date: 18 November 2026, 14:00 UTC
  • Project: Flare Network
  • Coins: FLR
  • Category: Network Upgrade
  • Status: Confirmed
  • Source: https://cryptonews.net/news/altcoins/33733584/